← All services
Development & App Modernisation

Development & Application Modernisation

Turn legacy into leverage, moving the apps your business relies on to the cloud and the Microsoft stack.

Overview

Modernise the applications you depend on

In short: Move the applications holding you back, without the full rebuild that never actually happens. Rehost first, get real usage visible, then right-size against what you measure. Redesigning before you can see how something behaves is how these projects overrun.

Every business has at least one application it would rather not talk about, old, awkward, and holding back everything around it. Very few replacements actually happen, because the plan is always the same: stop, rebuild it properly, switch over. That plan is exactly why nothing changes.

Who this is for
A core application is slowing the business down but a full rewrite feels too risky
You want to move onto Azure and the Microsoft stack without a big-bang cutover
You need a pragmatic roadmap, not a two-year rebuild before anything improves

The problem

A big-bang rewrite has to work perfectly on day one to be worth anything, and most run twelve to eighteen months over a moving target while the business gets no value in the meantime. Left alone, the old application keeps ageing, keeps costing, and keeps being the thing nobody dares touch.

What we would do

Rehost first and treat it as the first step rather than the finish line. Move the workload, get real usage visible, then right-size against measured utilisation. Redesigning before you can see how something actually behaves is how modernisation programmes overrun.

  • If the application is genuinely at end of life and the vendor has gone, replacement or capture is the decision, not migration.
  • If you are running two systems during a transition, budget for that explicitly. It is a real cost, and pretending otherwise is how incremental programmes get sold optimistically and judged harshly.

When we are not the answer: If the application works, is supported, and nobody is being held back by it, leave it alone. Modernising something that is not causing a problem is a cost with no return, and we will say so.

How we help

The applications that run your business shouldn't hold it back. We assess your estate and chart a pragmatic path to modernise, whether that's replatforming, rebuilding or extending onto the Microsoft stack.

More on how we deliver application modernisation

You don't have to rebuild everything at once. We take an incremental approach that reduces risk and delivers value at each step, so improvements land continuously instead of arriving all at once, if they arrive at all.

Retro pixel-art illustration of Tetris-style blocks stacking and assembling into a tower
What's included

Everything you need, managed for you

Legacy application assessment and roadmap
Azure migration and replatforming
Power Platform and custom development
API integration and workflow automation
Incremental modernisation with minimal disruption
Ongoing support and enhancement

How do you decide what to modernise first?

By assessing applications against two axes rather than one: how much pain each causes, and how much value would be released by changing it. Business criticality on its own produces the wrong order, because the most critical application is usually also the most frightening to touch, so the plan stalls at item one.

What we look for instead is the highest-pain, highest-value piece, which in practice means whatever generates the most support tickets, whatever blocks the features the business actually wants next, or whatever single system is holding an entire platform decision hostage.

The assessment itself is unglamorous and it is where the cost of the whole programme gets decided. For each application we establish what it genuinely does, including the parts nobody documented; who uses it and how often, because usage is regularly a fraction of what people assume; what it depends on and what depends on it; whether the vendor still exists and still supports it; what data it holds and where that data goes; and what the platform underneath it is, along with how long that platform has left.

The output is a ranked roadmap where each item names the route, the reason and the trigger, so the sequence survives contact with a busy quarter rather than reverting to whatever is loudest.

Rehost, replatform, refactor or replace: which applies?

The four routes answer different questions, and the mistake that costs the most is choosing one for the whole estate. Rehost, often called lift and shift, moves the application as it is onto new infrastructure without changing it: fastest, lowest risk, and it fixes exactly one problem, which is the hardware or datacentre underneath.

Replatform keeps the application broadly intact but swaps components for managed equivalents, most commonly moving a database onto a managed service or a web tier onto an app service, which removes patching and capacity work without touching the code that carries your business logic.

Refactor changes the application itself, usually to break a monolith into pieces that can be deployed and scaled separately, or to rewrite one part that has become the constraint. Replace retires the application in favour of something else, whether a product you buy or something built new. The decision rule we use is simple: work out what the actual problem is first.

If the problem is the platform, do not touch the code. If the problem is one component, do not rebuild the whole thing. If the problem is the business logic rather than the technology, replatforming faithfully just gets you the wrong thing on newer infrastructure. Most estates end up using two or three of these routes across different applications rather than committing to one.

Why does lift and shift produce a bigger bill than expected?

Because a server sized for a five-year on-premises life gets recreated exactly as it was, and cloud charges by the hour for capacity you owned outright before. On-premises, an oversized machine costs you nothing extra once it is bought; the waste is invisible and permanent. Rehosted, that same over-provisioning becomes a monthly invoice line that grows with every server you move.

Add the components that used to be free because they were already in the building, storage tiers chosen out of habit rather than measured need, backup and data transfer, and non-production environments left running around the clock, and the total lands well above the business case.

It is fixable, and the fix is not to avoid rehosting. It is to treat rehosting as the first step rather than the finish line:

  • Right-size against measured utilisation once real usage is visible
  • Shut down what does not need to run overnight and at weekends
  • Match storage tiers to actual performance requirements
  • Apply reservations or savings plans against a measured baseline rather than a peak

That work is the same discipline as our cost management and Azure optimisation service, and it belongs in the plan from the start. A migration with no optimisation phase scheduled after it is a migration that will produce an uncomfortable invoice review in about four months.

Why do big-bang rewrite projects fail to ship?

Three reasons, and they compound. Scope creep, because the existing application contains undocumented business rules, edge cases nobody remembers the reason for and integrations quietly holding three other systems together, all of which surface one at a time during the rebuild.

The business does not get to pause, so the old application has to keep running in full for the entire project, and every hour spent on the new system is an hour not spent improving the one people are actually using. And timing: rewrites commonly take twelve to eighteen months, sometimes longer, by which point the requirements captured at the start have moved, and you can end up delivering a faithful rebuild of a system the business has already outgrown.

The structural problem underneath all three is that a big-bang rewrite has to work perfectly on day one to be worth anything. Until the switchover, every penny spent is sunk cost with nothing running to show for it, which is also why these projects are so easy to descope or quietly abandon six or nine months in when budgets tighten.

The people who authorised it have seen no value, so there is nothing to defend. That is not an argument against ever rebuilding. It is an argument against making the whole thing contingent on a single future date.

What does incremental modernisation actually look like?

It replaces a legacy system piece by piece, from the outside in, in what is usually called the strangler pattern. You put a stable interface in front of the old application, then build new components behind it one at a time, routing traffic to each new piece as it becomes ready.

The legacy system keeps handling everything not yet rebuilt. Nothing is switched off until its replacement is already carrying live traffic successfully, which means there is no single switchover date on which everything has to work, and no point at which the business is betting on a future event.

Two ordering rules make the difference between this working and becoming an expensive rewrite in slow motion. Move data and integration layers before touching the interface: getting the data into a stable home and building solid APIs around it gives everything else a foundation, and it is usually less politically sensitive than changing a screen people use every day.

And build the new pieces on managed platform services rather than recreating the old architecture in a new location, because rebuilding the same design on newer infrastructure inherits the constraints you were trying to escape. Each increment has to be genuinely deliverable on its own, or you have simply broken a rewrite into instalments nobody can use.

What does running old and new side by side actually cost?

More than either system on its own, and it should be budgeted rather than wished away. During the transition you are running two things:

  • Data may need to flow both ways, so neither side goes stale
  • Two systems need monitoring instead of one
  • Support staff need to know which users are on which path
  • Every defect starts with the question of which side it came from

That is a real cost, and pretending otherwise is how incremental programmes get sold optimistically and then judged harshly.

The reason it is still usually the better trade is that the cost is bounded and visible, whereas the risk it removes is neither. A big-bang cutover concentrates all the uncertainty into a single weekend, with a rollback plan that gets less credible the longer the new system has been taking transactions.

Incremental transition spreads that risk across many small, reversible steps. The discipline that keeps the cost bounded is refusing to let the transition period drift: each increment should have a defined point at which the old path is switched off and decommissioned, because parallel running that never ends is the most expensive outcome available.

Where does Power Platform genuinely fit, and where does it not?

It fits best where the work is forms, workflow, approvals, and putting a usable interface on data that already lives in your Microsoft estate. A departmental process running on a spreadsheet and an email chain, an approval flow currently maintained by someone remembering to chase people, a request or booking system nobody has ever had the budget to build properly: these are exactly what Power Apps, Power Automate and Dataverse are for, and building them conventionally is usually poor value.

It also fits as the extension layer around a system you are not replacing, adding the workflow the core product does not do rather than customising the core product into something unsupportable.

Where it fits poorly is high-volume transaction processing, genuinely complex algorithmic logic, anything with hard real-time performance requirements, and anything that needs to be portable off the Microsoft platform later. There is also a governance dimension that gets discovered late: low-code makes it easy for anyone to build something the business then depends on, which is how organisations accumulate a second shadow estate with no owner, no documentation and no lifecycle.

Licensing needs checking against the actual usage pattern before you commit, because the model differs by connector and by app type and is not something to assume. Used deliberately it is one of the highest-return tools available. Used as a default answer, it becomes next decade's legacy problem.

What about data, APIs and the integrations nobody documented?

The integrations are usually the actual project. Almost every application that has been in service for years has grown connections nobody wrote down: a nightly file drop another system depends on, a database view someone else's reporting tool reads directly, a scheduled task that emails a spreadsheet to finance, a hard-coded server name inside a third system.

Discovery has to find these before anything moves, because each one is a way for a successful migration to break something in an unrelated part of the business a week later.

The remedy is to put a deliberate interface where an accidental one grew. Replacing direct database access with a documented API is often the single highest-value early increment, because it decouples everything downstream from whatever you do next and lets you change the system behind it without renegotiating with every consumer.

Data needs its own plan alongside: what is migrated, what is archived, what is deliberately left behind, how the two sides stay consistent during transition, and how you prove afterwards that nothing was lost. Getting that plan wrong is the failure that is hardest to correct retrospectively, because by the time anyone notices, months of new transactions sit on top of it.

When is a full rebuild genuinely the right answer?

In two situations, and it is worth being strict about them. The first is when the underlying platform is fully unsupported or unsupportable, so there is no stable base left to build anything around: you cannot incrementally strangle a system that will not run on anything you are allowed to deploy.

The second is when the business logic itself is wrong rather than the technology it is built on, because a faithful replatform of the wrong process delivers the wrong process, faster and on a better invoice.

Even then, the runway question decides the approach. A rewrite is commonly a twelve-to-eighteen-month undertaking, and an application sitting on an already-unsupported operating system rarely has that time available. Where that is the case, capture-based migration onto a modern supported platform buys the breathing room, and the rebuild happens on its own timeline rather than against a security deadline.

That is a bridge rather than a destination, and it should be called one in the plan. The failure mode is treating the bridge as the answer, then finding four years later that the temporary arrangement is now the thing nobody dares touch.

What does modernisation done properly look like?

The test is whether value arrived before the project finished. A programme running properly has shipped something usable within the first few months, has an explicit route recorded for every application in the estate including the ones deliberately left alone, has decommissioned at least some of what it replaced rather than accumulating both, and has a cost picture that someone reviews rather than discovers at renewal. It also has fewer surprises over time rather than more, because discovery work done early is what removes them.

The other marker is that the new thing has a lifecycle. Most legacy applications did not start as legacy. They started as a successful project that then had:

  • No owner
  • No upgrade path
  • No documentation
  • No budget line

And then drifted for a decade.

Avoiding a repeat means naming an owner, keeping dependencies current rather than pinned, keeping the deployment process automated so releasing is routine, and writing down enough that the next person does not have to reverse-engineer it. Modernisation that produces a better system with the same neglect around it has bought you roughly ten years.

How does this relate to legacy migration, packaging and cost work?

They meet constantly and are usually cheapest scoped together. Our legacy modernisation and OS migration service deals with the platform underneath: Windows and Windows Server versions going out of support, and applications that cannot move because the install media, the source code or the vendor no longer exists.

That is frequently the trigger for a modernisation conversation rather than a separate matter, because an end-of-support date is a deadline the business cannot argue with, which makes it the moment the awkward application finally gets attention.

Application packaging and MSIX is the delivery side of the same problem: once an application has been captured or rebuilt, it still has to reach users reliably and repeatably, whether that is on managed desktops, in Azure Virtual Desktop host pools or on Windows 365 Cloud PCs.

And cost management and Azure optimisation is what stops a successful migration turning into an unpleasant invoice, which is why we schedule it after a rehost rather than treating it as an unrelated engagement. If your modernisation is really an end-of-support problem, or really a cost problem, we will say so rather than selling you the more expensive interpretation.

Modernisation routes compared: rehost, replatform, refactor and replace.
RouteWhat actually changesBest whenWhat it does not fixMain risk
Rehost (lift and shift)The infrastructure underneath; the application is moved broadly as-isHardware or a datacentre is the deadline, and speed matters more than eleganceAnything about the application: the same design, the same constraints, new addressConsumption cost if sizing is copied from on-premises and never revisited
ReplatformComponents swapped for managed equivalents, such as the database or web tierThe application is sound but the operational burden around it is notApplication design, or business logic that was already wrongCompatibility gaps between the old component and its managed replacement
RefactorThe application itself, in parts, so pieces can be changed and scaled separatelyOne component is the constraint, or the monolith blocks every changeA product decision: it improves how the thing works, not what it doesScope drifting outward until it has quietly become a full rewrite
Replace or rebuildEverything; the application is retired for a product or something newThe platform is unsupportable, or the business logic itself is wrongNothing, but it fixes nothing at all until it shipsTwelve to eighteen months with no value delivered until the end
Frequently asked

Questions we hear a lot

Do we have to rewrite the whole application at once?

No, and usually you shouldn't. We favour incremental modernisation, replacing or replatforming piece by piece, so the business gets value at each step and risk stays low, rather than betting everything on a single big-bang rewrite.

When does it make sense to migrate rather than rebuild?

When the application still does its job and the platform underneath it is the problem, migration or replatforming is faster, cheaper and far less risky than a rewrite. We assess each application on its merits and recommend the pragmatic path, not the most expensive one.

Can you modernise applications onto Azure and the Microsoft stack?

Yes. We migrate and replatform onto Azure, extend applications with Power Platform and custom development, and add API integration and workflow automation so legacy systems connect cleanly to the tools your business already uses.

What's the difference between rehosting, replatforming, refactoring and replacing?

Rehosting moves the application as it is onto new infrastructure, which fixes the hardware or datacentre problem and nothing else. Replatforming keeps the application broadly intact but swaps components for managed equivalents, typically the database or web tier, removing patching and capacity work without touching your business logic. Refactoring changes the application itself so parts can be deployed and scaled separately. Replacing retires it for a product or something new. The rule we work to is to identify the actual problem first: if it's the platform, don't touch the code; if it's one component, don't rebuild the whole thing.

Why did our lift and shift end up costing more than expected?

Almost always because servers were recreated at the size they were on-premises, where over-provisioning was invisible and already paid for. In the cloud that same headroom becomes an hourly charge, and it's joined by things that used to be free because they were in the building: storage tiers picked from habit, backup, data transfer, and non-production environments left running around the clock. The fix isn't to undo the migration, it's to treat right-sizing, shutdown schedules, storage tiering and reservations as a scheduled phase after it, against measured usage rather than assumptions.

How do you deliver value before a modernisation project finishes?

By putting a stable interface in front of the old system and replacing pieces behind it one at a time, routing live traffic to each new component as it becomes ready. The legacy system keeps handling whatever hasn't been rebuilt, and nothing is switched off until its replacement is already carrying real work. That removes the single switchover date everything depends on. Two ordering rules matter: move the data and integration layers before touching the interface, and build the new pieces on managed platform services rather than recreating the old architecture somewhere newer.

Where does Power Platform fit, and where would you advise against it?

It fits forms, workflow, approvals and putting a usable interface on data already in your Microsoft estate, and it works well as an extension layer around a system you're not replacing. It fits poorly for high-volume transaction processing, genuinely complex algorithmic logic, hard real-time requirements, or anything that may need to move off the Microsoft platform later. There's also a governance point worth planning for up front: low-code makes it easy for anyone to build something the business then depends on, which is how a second undocumented estate appears. Licensing should be checked against your actual usage pattern rather than assumed, because the model varies by app type and connector.

What usually gets missed when scoping a modernisation?

The undocumented integrations, and they're usually the actual project. A system in service for years grows connections nobody wrote down: a nightly file drop something else depends on, a database view read directly by a reporting tool, a scheduled task emailing a spreadsheet to finance, a hard-coded server name inside a third application. Each one is a way for a successful migration to break something unrelated a week later. Replacing direct database access with a documented API is often the highest-value early piece of work, because it decouples everything downstream from whatever you do next.

Our application is on an unsupported OS. Do we modernise or migrate first?

Deal with the security deadline first, then modernise on your own timeline. A rewrite is commonly a twelve-to-eighteen-month undertaking, and an application on an already-unsupported operating system rarely has that long, so trying to do both at once means running unpatched while a project you can't rush completes. Capture-based migration onto a modern supported platform buys the runway in weeks, which is our legacy modernisation and OS migration service rather than this one. Just be honest in the plan that it's a bridge, because bridges that get relabelled as destinations are how the next legacy problem starts.

Application modernisation is delivered UK-wide from our office in Brough, East Yorkshire, with on-site support across the county where it helps. We work with businesses in Barnsley, Halifax, Doncaster, Wakefield, Harrogate and Huddersfield and 6 more Yorkshire towns and cities, and remotely with clients right across the UK.

Which applications actually block you?

Tell us what is in the estate and what you are migrating to. We will sort the applications into what converts, what needs remediation, what has to be captured, and what should be retired.

Technology partners

Best-of-breed technology we use to deliver application modernisation.

See all technology partners →